Planned Electrical Shutdown for Building 9060

Contract Operator will be performing a planned electrical shutdown for Building 9060 starting on Friday, October 18, 2019 and will be completed Saturday evening, October 19, 2019. Normal power to Building 9060 will be unavailable for most of the day on October 19. Normal power is expected to be restored by no later than 7:00 pm Saturday evening.

Feeder Switch Schedule:

• Friday Oct 19:

     o Buildings 9040, 9042, 9052, 9060 and 9062 will be switched to PA2 by Jacobs. No impact to electrical service is anticipated.

• Saturday Oct 19 (early am):
    
     o Normal power will be shutdown to building 9060 for maintenance on Sub 15 for most of day.

• Saturday Oct 19 (mid-day):

     o Buildings 9070 9040,9042,9052 and 9062 will be switched to PB2 by Jacobs. No impact to electrical service

• Saturday Oct 19 (at the end of the shutdown):

     o Buildings 9040 (Subs 12,13,14), 9042 (Sub 17), 9062 (Subs 16 and 42) will be switched to PA2 by Jacobs.

     o Buildings 9042 (Subs 18,19 and 41), 9052 (Sub 20) and 9060 (Sub 15) shall remain on PB2 (no switching required at the end of the shutdown).

If you should have any questions please do not hesitate to contact Shelly Jost at OccupantServices@uastp.com. In addition, please visit www.uastp.com to stay informed on recent operations advisory announcements.

Thank you.