Natural Gas Pipe Modification

Contract Operator will be performing a modification to the Natural Gas Piping inside the Central Utility Plant on October 18, 2019 from 7:30 AM until 5:00 PM. During this time, we have requested minimum Natural Gas Usage to support a temporary by-pass pipe capacity. The use of the temporary by-pass will prevent an extended shut-down of the entire natural gas system.

In support of the reduced gas use, the boilers in buildings 9020, 9024, 9030 and 9052 will be shut off. Other areas will have their boilers set to minimum gas usage. The critical operations in 9022 will not have boilers output reduced.

Thank you for your support of this work.

Shelly Jost

Occupant Services Coordinator

If you should have any questions please do not hesitate to contact Shelly Jost at OccupantServices@uastp.com. In addition, please visit www.uastp.com to stay informed on recent operations advisory announcements.